Another warm day and working on the second level is quite hot. Just t-shirts again.
John is sick today and I am taking most of the day off and letting Russell and Brian work together.
It is not hard work so it is best if Russell has only one person explaining the system to him.
Brian also takes less short-cuts and takes his time. These contractors hate that they love to move very quickly.
I cleaned inside a little and am finished removing the old tiles outside.
We wanted the tiles gone because the floor gets wet when it rains and the tiles keep the plywood wet for a long time. It was hard on the back because you are bending over and removing the tiles with a paint scraper. Done though, done...done...done.
We are supposed to get rain tonight and tomorrow so the guys are trying to get some levels of foam on.
There is always much discussion about where windows and doors will go. At least upstairs there were minor window changes.
 |
Looking into the family room. |
 |
Kitchen and family room. |
 |
This will be bathrooms and master bedroom. |
 |
This will be the library and the end will be Brian's record storage and movie room. |
 |
The front of this will have two bedrooms. |
 |
Looking at the sunroom and family room on the left. |
 |
This is the only original window left. It looks into the closet but I am keeping it. |
E/B