I'm not as worried about the house not getting done before winter. We should have it closed in at least.
Brian and Evan showed up on Sunday afternoon and it is nice to have Brian home.
Evan will leave tomorrow for Eden Mills trying to beat the weather that will be a problem later.
He is working on a cabinet for Graham and will make sure the house in Eden Mills does not blow away.
Monday was just getting lumber delivered and filling another bin with garbage. The guys are putting down the 2 by 4 to mark out some rooms.
Tuesday is rim boards and putting up some walls. It is hard trying to figure out where we want the doors. I know we had someone design it but some of these things will change based on how we will use a room.
We shut down at about one today because it has started to rain. The rain has not stopped yet. It is soaking the walls in the dining room and swelled the wood around the back door so it almost impossible to open. We may have to stop using that door until it dries out a little.
![]() |
Seeing walls is amazing. |
![]() |
Now we have piles of wood everywhere. |
![]() |
Yeah!!!! |
![]() |
Closet and two bathrooms. |
![]() |
Now we just need the rain to stop so we can get moving. |