Friday, 27 September 2013

It was such a warm day that it was a shame we had to work inside so much.
Although it was something the siding guys are happy with.  Their progress is still a little slow but Ely is pretty much mentoring these young guys.  He has to show them how to do everything so his time is spent teaching and not installing siding.
He will bring in another guy on Monday who is more skilled so it should move quickly then.  Still getting a lot of positive comments from the neighbours which makes Brian really happy with his choice.  I thought the trim might be too dark but it looks good.

Two more coats of varnish on the floor with one more to go before we are through.  It will have plenty of time to sit before the appliances arrive on Monday.  I guess we should make a path through all the wood in the garage for the delivery.

I think we will take a few days to visit with friends who are coming down and relax a little.
Because Monday we still have a few bathroom items to take care of, like installing a toilet and sink.
E/B
Second coat of varnish.

Still needing that third coat.

Looking to the door into the garage.

Third coat of varnish.

Getting the shine I want.

Brian being a good neighbour and sweeping up the dirt left by Drew.

This is as high as they will go up the wall and we will but up a  frieze board later.  It was what the old house had with crown moulding.