Monday, 23 September 2013

AHH!  Monday!

It's not like we took Sunday off we worked all day on the floor.  It is not easy trying to find the right board because of all the lengths to choose from and different widths within the pile.
We would be trying to fit a board in and find there would be spaces because not all the boards are 9 and a 1/4 inches wide.  If a narrower one had already been nailed down we would go to the pile to find one to match.  It was actually kinda fun since I like puzzles anyway.

Today just the Duradec guys showed up.  We put the landscaping off till Wed. so the yard can dry a little before he tackles moving so much dirt.
Did not hear from the siding guys but we are hopeful they will show up this week.

Brian and I finished up most of the flooring although he has done some of the smaller stuff on his own while I try and clean up the mess from the tiling and when we sprayed on the primer downstairs.  Not smart spraying without taping the doorways to the rest of the house.
I have also been grouting the main bath and found out that the ready mixed grout is much harder to clean up than the Ultra Colour dry mix we have been using.  It may not look so bad in there when I am done.  Just don't look too closely.

E/B
Letting the glue set before putting it down.

All done and we have already had a coffee out there.

This deck is 16 by 25 feet and no real maintenance certainly no staining or rotting wood.

Just the edges then we can sand.

I'm hoping we can sand tomorrow afternoon.

No comments:

Post a Comment