A day without doing trim work is a good day in my book. We seem to be at a point where it needs to wait for the siding guys to come before anymore can be done,YEA!!!..
Today I got the back stairs painted or the servants stairway that is. I painted it the same green as the front stairs because I now have a gallon of that paint since the store made me that instead of a quart.
I guess because I asked for another colour in that size they thought I wanted both in that size.
It's okay I like green, really I do like green. It makes me happy.
I also got the family room kitchen ready for floor. Which means using the shop-vac on it since nothing else will clean the floor. One thing I would do differently if I was going to build anything where you needed a sub-floor is I would buy any old off tint paint I could find and paint the subfloor. It would be so nice when it came to keeping the place clean and the dust down. All you would have to do to clean it would be sweep and a quick mop and we're done.
Also Brian and I prepared the sunroom roof for the Duradec covering that will be installed on Sat. if there is no rain.
My other fun job was clean the tiles to prepare for grout in the main bath. Just made me sad and mad at the same time. There was mortar everywhere on the ceiling the walls and the tiles. And the tiles are just so bad.
E/B
Today I got the back stairs painted or the servants stairway that is. I painted it the same green as the front stairs because I now have a gallon of that paint since the store made me that instead of a quart.
I guess because I asked for another colour in that size they thought I wanted both in that size.
It's okay I like green, really I do like green. It makes me happy.
I also got the family room kitchen ready for floor. Which means using the shop-vac on it since nothing else will clean the floor. One thing I would do differently if I was going to build anything where you needed a sub-floor is I would buy any old off tint paint I could find and paint the subfloor. It would be so nice when it came to keeping the place clean and the dust down. All you would have to do to clean it would be sweep and a quick mop and we're done.
Also Brian and I prepared the sunroom roof for the Duradec covering that will be installed on Sat. if there is no rain.
My other fun job was clean the tiles to prepare for grout in the main bath. Just made me sad and mad at the same time. There was mortar everywhere on the ceiling the walls and the tiles. And the tiles are just so bad.
E/B
Maybe we can start the flooring tomorrow. |
It needs to be level and nothing sticking up. |
![]() |
When they took out the niches it turns out they were glued to the drywall in this bathroom. See the bumps under the hole? They have to be cut out and filled with a patch as well. |
![]() |
Ready for tile. Wish us luck. |