Friday, 20 September 2013

Another day and another row of tiles.  It will take some time to finish these since we want to do it right this time.

Brian is busy sanding the roof outside so the Duradec can be applied.  It looks like rain tomorrow and tonight so it may not be until Monday.  It will be beautiful and smooth though.

I finished off the servants stairway so that is another job that will not have to be tackled for a while.  I do say this about the stairways but most of the drywall on those has problems, screws popping and holes between it and the baseboards.  So there will be a mess again I'm just hoping it will not be for  a long time.

Everyone should be on floor duty when lunch is over.  In preparation for that we moved the freezer to the basement  and I hope to convince Brian we can do without the stove and sink for a week or so.  It would make it easier to finish the room.
We'll see I'll talk to him at happy hour on the porch.

E/B
It's nice enough to stain and party on it.

This is a really hot deck.  It needs a sail or umbrella.

The end result of the holes from yesterday.

Two days and three rows of tiles on now. Notice the use of spacers that have stayed on.  Yes, we have insisted on that.

Another nice green stairway courtesy of the painter in the  house(me) 

No comments:

Post a Comment