Monday, 16 February 2015

Now we have moved on to the sunroom but those stories can wait so I can fill you in on the workroom.

Brian has been slowly unpacking his big machines and trying to find a layout he likes.  Once he has that done he can run his 220 wiring so it is near those machines.  This is a part of the project that he is really enjoying.  I think he forgot how many amazing machines and tools he had.  Brian got a fair number of them from his co-workers when he retired and is looking forward to using them.  He is a lucky boy.

Getting the floor done was time consuming but if you do not follow the right steps it will just peel off.  Especially on a power trowelled concrete floor .
He had to vacuum the floors a few times, then wash a few times, follow up with an etching agent, then wash a few time more, once more vacuum the floor and hopefully the paint will stick.  We did use an epoxy paint there so it should be better than the floor paint we used in the basement.
Finishing up the last quarter of the floor.  He moved everything four times .

Bandsaw to start.

Putting together the router table.

The router table all set up.  Lots left to do though.


E/B


No comments:

Post a Comment