Ah well we had a good run with the pool and now we are stalled. Rain is not good for new concrete so until we get a few days of clear weather we wait. Although Dwayne from Shelin has told Brian he(Brian) is free to decide if we pour or not but we will eat the cost of replacing the concrete if it rains, so we wait.
The pool crews still amuse us. When the concrete crew arrived in the back yard it was like, "the cool boys are here everybody out of the way". They swaggered in with the same colour shirts and sunglasses all in a line. As I said to Brian "Why are they not moving in slow-motion?"
Meanwhile we are pretty slow inside the house but we can get a lot done once colder weather sets in.
Brian has painted another part of the workshop and we have installed the medicine cabinets in the master bath.
The gardens are filling in so I should have a good plant base for next year.
E/B
 |
The concrete crew at work preparing to pour. |
 |
Getting the levels right, so very important. |
 |
Our granddaughter asked when she could get a tattoo. |
 |
Ready for the next step which is pouring the deck. |
 |
Hoping the weather clears up on Monday. |
No comments:
Post a Comment