Wednesday, 11 December 2013

Let the bells ring out and the banners fly the boiler is a go!!!!  After all this time it is finally running and it was such an easy fix.  It turns out that the pipes to outside were still plugged so no animals or nasty weather could get into the house and without air being brought in the machine would not fire.
I have not been this warm in the place for a long long time.  The new part is toasty warm but the old part is feeling much chillier.  It is nice to have the air temperature the same in every room of the new build and not freeze while trying to shower.  I love it.

Finished off another colourful part of the floor.  Still really hard to clean because of all the dirt in the concrete but I hope it was clean enough for the paint.

E/B
When the floor was poured the rain made holes in the concrete so Brian was finning them first.

Pink because a little girl asked for one room to be that colour.

We'll paint the block walls a light colour at some point and the hot water tank will be removed from this spot so I did not worry about paint on the tank.

No comments:

Post a Comment