Shelin finally arrived and installed the liner for the pool. It took a lot longer than they expected because they had not counted on all the extra work the concrete guys left for them. It turns out that when they sprayed off the concrete from the pebble finish on the deck they should have covered the pool to keep any extra concrete from getting on the walls and floor.
These poor guys had to go in with scrapers and brushes to get rid of it. Although they were not happy either was the guy with the truck of water. He sat around from 8am till 2pm waiting for them to get the liner installed.
Once that was done they got most of the equipment hooked up so now we just need to get the electricity to it and we are ready for next year.
These poor guys had to go in with scrapers and brushes to get rid of it. Although they were not happy either was the guy with the truck of water. He sat around from 8am till 2pm waiting for them to get the liner installed.
Once that was done they got most of the equipment hooked up so now we just need to get the electricity to it and we are ready for next year.
![]() |
This is a hard job. |
![]() |
We are not in love with the border. |
![]() |
Sucking air out from under the liner. |
![]() |
No shoes was a good idea. |
![]() |
Almost done, just the stairway to do. |
![]() |
And water but not full since we are just closing it anyway. E/B |