Here we go again. We had finally started the master bath again and finished the tile and grouting so I was impressed with how quickly we were moving along.
All the shower plumbing is done and it looks great. It will be nice to finally use that shower which will happen once the doors are on.
BUT..... as with most things there are now setbacks with the sinks.
Brian put the taps on and used plumbers putty around the taps and it has stained the marble top on both vanities.
We are trying poultices of baking soda and leaving it on overnight with saran wrap on top. The first round still left the stains so we are doing it again if this does not work I have read that acetone will remove it.
I sure hope so since they are very noticeable.
E/B
All the shower plumbing is done and it looks great. It will be nice to finally use that shower which will happen once the doors are on.
BUT..... as with most things there are now setbacks with the sinks.
Brian put the taps on and used plumbers putty around the taps and it has stained the marble top on both vanities.
We are trying poultices of baking soda and leaving it on overnight with saran wrap on top. The first round still left the stains so we are doing it again if this does not work I have read that acetone will remove it.
I sure hope so since they are very noticeable.
E/B